توجه: محتویات این صفحه به صورت خودکار پردازش شده و مقاله‌های نویسندگانی با تشابه اسمی، همگی در بخش یکسان نمایش داده می‌شوند.
۱The required power of the MGT–40 gas turbine starter
نویسنده(ها): ، ،
اطلاعات انتشار: Energy Equipment and Systems، سوم،شماره۲، Autumn ۲۰۱۵، سال
تعداد صفحات: ۶
Determination of the starter torque–speed diagram is a major task in the design or selection of a proper gas turbine starter. In this paper, the maximum power of the MGT–40 gas turbine starter was calculated based on the dynamics of the rotor, start–up logic, and compressor map. In a recent research, the pressure ratio was assumed as a linear function of the rotor speed and the required starter power was calculated. In this study, the value is determined from the field data. To evaluate the proposed method, the results of obtained power were compared with that of the turbine performance reports. The comparison resulted in a reasonable engineering approximation.
نمایش نتایج ۱ تا ۱ از میان ۱ نتیجه