توجه: محتویات این صفحه به صورت خودکار پردازش شده و مقاله‌های نویسندگانی با تشابه اسمی، همگی در بخش یکسان نمایش داده می‌شوند.
۱The Batch Production Scheduling Problem for Perishable Products with Sequence–Independent Setup Times
اطلاعات انتشار: هفتمین کنفرانس بین المللی مهندسی صنایع، سال
تعداد صفحات: ۹
The focus of this paper is problem of batch production scheduling for perishable products with setup times, with the main applications in answering production planning problems faced by manufacturers of perishable products, such as vaccines and yoghurts. We develop concepts and methodologies that are applied the batch production scheduling problem for perishable products with sequence–independent setup times and continuous batch size (BPP–SI–CB). The problem is that given a set of periodic demand for perishable products to be produced by a set of parallel machines in single stage batch production, with each product having fixed shelf–life times and each machine requiring setup times before producing a batch of product, find the master production schedule which minimizes total cost over a specified time horizon. We present the new models for problem as a Mixed Integer Program (MIP) in discrete time.<\div>
نمایش نتایج ۱ تا ۱ از میان ۱ نتیجه